Vineyard RDA Lift Station #2
Construction of a 32 ft. deep reinforced cast-in-place concrete sewer lift station. Included were the CMU building, excavation and back fill of the structure, installation of equipment, 18"-30" piping, electrical, pumps, 275kW Generac 600A ATS generator and mixer. High ground water required engineered dewatering operations and trench stabilization throughout the project. 