Spanish Fork PI Booster Station
The purpose of this project was to construct a new filter building for pressurized irrigation. The building was constructed with a block exterior and metal roofing, requiring an overhead crane. The piping in the station was 36 IN manifold welded steel, coated pipe. The project required four 250 HP pumps. Surge valves, control valves, flow meters, a filter HVAC and electrical sourcing were installed in the building.