Central Pipeline
Installed 31,600 LF of 48" welded steel pipe, pipeline excavation of 130,000 CY, pipeline embankment, and cutting roads. Blow off facilities, a turnout meter vault, cathodic protection facilities, SWPPP, erosion control measures. 11,000 FT of a parkway trail, equestrian trail, pedestrian bridge, and pipeline connections. Installation of 600 LF of 36" HDPE, and 900 LF of 6' HDPE. Construction of a new fluoride injection building along with civil site improvements, new mainline valve vault, new interconnection and flow control vault at the miscellaneous segments of new welded steel pipeline and fittings varying from 14" to 24". Included 6 canal crossings, lined canal with 200' of concrete lining. 200,000 SF of road reconstruction on Jordan Narrows Road. 